Construction of Indoor Gymnasium-Swimming Pool and Two Tennis Courts

Scroll or Drag Sideways

Activity

Construction

Υear of implementation

2018

Client

Municipality of Korydallos

Budget

8,389,840.00 €

Description

The new indoor gymnasium and swimming pool in Korydallos, which also includes two tennis courts, was constructed using geothermal energy, bioclimatic systems, and cold materials, contributing not only to the aesthetic enhancement of the area but also to environmental protection.

The building has a covered area of 1,570.98 m² and spans three levels. It features stands with a capacity of 225 spectators, with a swimming pool tank measuring 21 x 25.03 m. The project includes earthworks, demolitions, concreting, construction works such as masonry, plastering, cladding, paving, etc., wooden and metal constructions, electromechanical works, automation and telemetry works, as well as landscaping.

WE BUILD THE FUTURE

Works

Facebook /

@zitakat

Facebook /

@zitakat

@zitakat

Facebook /

WE BUILD THE FUTURE

@zitakat

Facebook /

WE BUILD THE FUTURE

XΤΙΖΟΥΜΕ ΤΟ ΜΕΛΛΟΝ

Facebook /

@zitakat

@zitakat

Facebook /

WE BUILD THE FUTURE

@zitakat

Facebook /

WE BUILD THE FUTURE

XΤΙΖΟΥΜΕ ΤΟ ΜΕΛΛΟΝ

Facebook /

@zitakat

Facebook /

@zitakat

@zitakat

Facebook /

WE BUILD THE FUTURE

@zitakat

Facebook /

WE BUILD THE FUTURE